Fairflux Pvt. Ltd. delivers high-performance refractory and flow-control solutions trusted by steel manufacturers for over three decades — including our Cold Board Ladle Lining System, engineered to cut costs and boost production.
Years Experience
Steel Plants
Successful Projects
Operational Network
An ancillary unit of Steel Authority of India Limited — Bhilai Steel Plant, Fairflux was established in 1991 and has grown into a trusted metallurgical products partner for the steel and foundry industries.
Backed by a dedicated team of metallurgical engineers and a close working relationship with SAIL — Bhilai Steel Plant, we maintain rigorous quality control on every batch and continually develop newer products to meet evolving plant requirements.
Tundish Board Assembly
Preheat-free ladle lining system in silica & basic boards, available for 1 MT to 12 MT ladles — and up to 20 Ton on request.
Learn more →Cold Tundish Boards of any size or shape for continuous casting, sealing cleanly around the collector nozzle.
Refractory boards engineered for extreme conditions.
Tundish casting compounds reducing heat loss.
Nozzle filling compound ensuring reliable flow.
Insulating & exothermic sleeves, open or blind, improving yield.
A preheat-free ladle lining system for bottom-pouring ladles. The scenario in the foundry changes completely once Cold Ladle Boards replace conventional refractory lining — no more ladle preheating, nozzle choking, skull generation, or preparation delays. Boards are available for ladles from 1 MT up to 20 MT.
Installed Cold Board lining, ready for the next heat
Saves furnace oil / LDO and eliminates the recurring and capital cost of a pre-heater and its space.
The melter is relieved from the tension of getting a ladle ready and can concentrate on heat-making.
No skull or jamming forms in the ladle, eliminating the need for oxygen lancing.
Yield of metal increases as loss due to ladle failure and skull formation is eliminated.
No refractory bricks or mortar needed, keeping steel free of refractory inclusions and dirt.
Consistent temperature fall from furnace to ladle standardizes tapping temperature every heat.
100% safe working; the ladle is ready within 3 hours for the next casting, doubling shop production.
Cool, ready-to-inspect ladles reduce risk and make cleaning and inspection straightforward.
Two bottom boards are installed first, after leveling the base of the ladle with dry sand. One board has a hole for the nozzle, aligned with the ladle's nozzle hole, then fixed with adhesive paste.
Twelve vertical board panels are set side by side using the grooves in the bottom boards to complete the circle. All joints are sealed with the adhesive cement paste supplied with the boards.
Coarse, dry sand fills the gap between the boards and the ladle's safety lining, allowing evolved gas to escape freely. The stopper rod is installed in the conventional way.
Unlike the boards, the nozzle and stopper rod need brief pre-heating — the nozzle is heated from the bottom for 15–20 minutes before the ladle is used.
Heat is removed from the nozzle, the ladle is inspected and tapped normally. After pouring, the nozzle is pushed out and the lining falls out when the ladle is inverted — ready for immediate relining.
Whether it's a slide-gate nozzle feeding a mould directly or a stopper-rod bottom-pouring ladle feeding through a hot top and spyout, Fairflux boards and compounds are built to seal each interface cleanly — protecting casting quality heat after heat.
Top pouring via slide-gate nozzle, and bottom pouring via stopper rod through a hot top and spyout onto refractory bricks — the two most common ladle-to-mould configurations our boards are built to seal.
Cold Tundish Boards of any size or shape for continuous casting, engineered to seal cleanly at the collector nozzle and Ar-purged joint before the long nozzle feeds the mould.
| Side Arch & Standard Bricks | ₹10,000 |
| Fire Clay & Grog | ₹11,000 |
| Metal / Filter Loss due to Skull (1.25 T) | ₹30,750 |
| Oil Consumption (2,500 Ltrs) | ₹1,00,000 |
| Extra Electricity Charges (250 T) | ₹30,000 |
| Extra Manpower | ₹5,000 |
| Oxygen (100 M³) | ₹2,000 |
| Metal Loss due to Ladle Failure (2.5 T) | ₹62,500 |
| TOTAL | ₹2,51,250 |
| Cost of Cold Boards | ₹1,50,000 |
| Loss due to Board Damage etc. | ₹3,000 |
| Other Miscellaneous Expenses | ₹10,000 |
| TOTAL | ₹1,63,000 |
Two dedicated product lines, one quality standard — everything below is manufactured to size, specification, or drawing.
Talk to our technical experts for customized refractory and Cold Board Ladle Lining solutions.