30+ Years · Industrial Excellence

Engineering Reliability for the Steel Industry

Fairflux Pvt. Ltd. delivers high-performance refractory and flow-control solutions trusted by steel manufacturers for over three decades — including our Cold Board Ladle Lining System, engineered to cut costs and boost production.

"Cast Steel With Smile"

30+

Years Experience

100+

Steel Plants

5000+

Successful Projects

Pan India

Operational Network

Heat No. 01 — Who We Are

A Legacy Built on Performance

For more than 30 years, Fairflux Pvt. Ltd. has partnered with steel producers to deliver consistent quality, safety, and operational efficiency. Our solutions are developed through deep industry understanding, rigorous quality control, and long-term collaboration with customers.

Heat No. 02 — What We Offer

Core Solutions

Tundish Board

High-density insulation boards delivering thermal stability.

Ladle Board

Refractory boards engineered for extreme conditions.

TCC

Tundish casting compounds reducing heat loss.

NFC

Nozzle filling compound ensuring reliable flow.

Sleeves

Exothermic and insulating sleeves improving yield.

Heat No. 03 — Ladle Boards Both In Silica & Basic

Cold Board Ladle Lining System

A preheat-free ladle lining system for bottom-pouring ladles. The scenario in the foundry changes completely once Cold Ladle Boards replace conventional refractory lining — no more ladle preheating, nozzle choking, skull generation, or preparation delays. Boards are available for ladles from 1 MT to 12 MT.

Best Foundry & Practice 100% Safety For Bottom Pouring Ladle
Cold Board Ladle Lining diagram showing stopper rod assembly, insulation boards, loose sand fill, safety lining and nozzle hole
  • Stopper Rod Assembly (or Slide Gate)
  • Insulation Boards
  • Loose Sand Fill
  • Safety Lining — Standard Bricks or 1½" Tiles
  • Joint in Bottom Boards
  • Groove in Bottom Boards for Fixing Vertical Boards
  • Nozzle Hole
Cold Board Ladle Lining installed inside a ladle, top view

Heat No. 04 — Why Switch

Advantages of Cold Board Lining

No Preheating Required

Saves furnace oil / LDO and eliminates the recurring and capital cost of a pre-heater and its space.

Easy Ladle Availability

The melter is relieved from the tension of getting a ladle ready and can concentrate on heat-making.

No Skull Jam

No skull or jamming forms in the ladle, eliminating the need for oxygen lancing.

No Metal Loss

Yield of metal increases as loss due to ladle failure and skull formation is eliminated.

No Use of Refractory

No refractory bricks or mortar needed, keeping steel free of refractory inclusions and dirt.

Less Temperature Drop

Consistent temperature fall from furnace to ladle standardizes tapping temperature every heat.

Very Neat & Clean

100% safe working; the ladle is ready within 3 hours for the next casting, doubling shop production.

100% Safety

Cool, ready-to-inspect ladles reduce risk and make cleaning and inspection straightforward.

Heat No. 05 — How It Works

Description & Method of Use

01

Level & Set Bottom Boards

Two bottom boards are installed first, after leveling the base of the ladle with dry sand. One board has a hole for the nozzle, aligned with the ladle's nozzle hole, then fixed with adhesive paste.

02

Fix Vertical Panel Boards

Twelve vertical board panels are set side by side using the grooves in the bottom boards to complete the circle. All joints are sealed with the adhesive cement paste supplied with the boards.

03

Fill & Seal

Coarse, dry sand fills the gap between the boards and the ladle's safety lining, allowing evolved gas to escape freely. The stopper rod is installed in the conventional way.

04

Pre-heat Nozzle & Stopper

Unlike the boards, the nozzle and stopper rod need brief pre-heating — the nozzle is heated from the bottom for 15–20 minutes before the ladle is used.

05

Inspect, Tap & Reline

Heat is removed from the nozzle, the ladle is inspected and tapped normally. After pouring, the nozzle is pushed out and the lining falls out when the ladle is inverted — ready for immediate relining.

Heat No. 06 — 100 Heats × 2.5 MT (250 T Liquid Steel)

Estimated Cost Benefits

Conventional Refractory-Lined Ladle
Side Arch & Standard Bricks₹10,000
Fire Clay & Grog₹11,000
Metal / Filter Loss due to Skull (1.25 T)₹30,750
Oil Consumption (2,500 Ltrs)₹1,00,000
Extra Electricity Charges (250 T)₹30,000
Extra Manpower₹5,000
Oxygen (100 M³)₹2,000
Metal Loss due to Ladle Failure (2.5 T)₹62,500
TOTAL₹2,51,250
Cold Ladle Board Lining
Cost of Cold Boards₹1,50,000
Loss due to Board Damage etc.₹3,000
Other Miscellaneous Expenses₹10,000
TOTAL₹1,63,000
Net savings of ₹90,000 for 250 T of liquid steel — that's ₹360 per tonne — plus improved casting quality, cleaner steel, and lower fettling cost.
Heat No. 07 — Handling Guidelines

Precautions

Partner With a Proven Industry Leader

Talk to our technical experts for customized refractory and Cold Board Ladle Lining solutions.